401 | Design, Manufacture, Supply, Installation, Testing & Commissioning of Rescue Vehicle (Rail-cum-Road Vehicle with Re-Railing & Rescue Equipment) | Addendum No 2 | MM3-CBS-DEQ-9-04 | 08/11/2019 | file |
402 | Design, Manufacture, Supply, Installation, Testing & Commissioning of Rescue Vehicle (Rail-cum-Road Vehicle with Re-Railing & Rescue Equipment) | Response to Bid Queries (Set-2) | MM3-CBS-DEQ-9-04 | 08/11/2019 | file |
403 | Construction of Secant piling, slope protection and excavation works for Shunting Tracks area, at Ramp of car depot for Mumbai Metro Line-3 (Colaba-Bandra Seepz) Project. | Addendum No 1 | MML-3-CBS-DPT-SP | 06/11/2019 | file |
404 | Construction of Secant piling, slope protection and excavation works for Shunting Tracks area, at Ramp of car depot for Mumbai Metro Line-3 (Colaba-Bandra Seepz) Project. | Corrigendum - 1 | MML-3-CBS-DPT-SP | 06/11/2019 | file |
405 | EOI for Direct Access to MML3 Stations - MML3 alignment & station locations | | MMRC/Planninng | 01/11/2019 | file |
406 | EOI for Direct Access to Mumbai Metro Line 3 Stations - Notice | Notice | MMRC/Planning | 01/11/2019 | file |
407 | Expression of Interest (EOI) for Direct Access to Mumbai Metro Line 3 Stations | EOI | MMRC/Planning | 01/11/2019 | file |
408 | Design, Manufacture, Supply, Installation, Testing & Commissioning of A) Synchronized Under Floor Lifting System, B) Synchronized Mobile Lifting Jacks and C) Bogie Turn Tables | Addendum No 1 | MM3-CBS-DEQ-9-05 | 01/11/2019 | file |
409 | Design, Manufacture, Supply, Installation, Testing & Commissioning of A) Synchronized Under Floor Lifting System, B) Synchronized Mobile Lifting Jacks and C) Bogie Turn Tables | Response to Bid Queries (Set-1) | MM3-CBS-DEQ-9-05 | 01/11/2019 | file |
410 | Supply, Installation, Testing, Integration, Commissioning and Support of Common Asset Management System (CAMS) for Mumbai Metro Line 3 (MML3) | Corrigendum 2 | PRO/MMRC/56 | 31/10/2019 | file |