111 | Appointment of Architectural consultant for preparation of office setup and interior works at OCC 3rd floor, OCC entrance lobby & station 1st floor driver lobby in Aarey colony car depot of Mumbai Metro Line-3 project | Short Quotation Notice | MMRC/ML-3/Car Depot/Arch/24 | 02/01/2024 | file |
112 | Appointment of Environmental consultant for preparation of. report for the work of Ground water recharging arrangements to be provided in Aarey colony car depot of Mumbai Metro Line-3 project | Short Quotation Notice | MMRC/ML-3/Car Depot/Cons/24 | 02/01/2024 | file |
113 | Licensing of Space for Advertising Rights at Mumbai Metro Line -3 | NIT | MMRCL/Planning/PLN/NFBR/49(5)/RFP/01/2023 | 26/12/2023 | file |
114 | Licensing of Spare Optic Fibre Cables & Right of Way for Laying Additional Cables at Mumbai Metro Line 3 | Addendum No 4 | MMRCL/Planning/PLN/49(4)/NFBR/RFP/01/2023 | 22/12/2023 | file |
115 | Licensing of Spare Optic Fibre Cables & Right of Way for Laying Additional Cables at Mumbai Metro Line 3 | Addendum No 3 | MMRCL/Planning/PLN/49(4)/NFBR/RFP/01/2023 | 15/12/2023 | file |
116 | Cleaning of Rolling Stock (Metro Train) & RRV and Mechanized Cleaning & Housekeeping works of Sariput Nagar RSS, Aarey Metro Station, & Aarey Depot Premises at Line-3 of MMRCL | NIT | MM3-CBS-OPS-HK-PKG01/2023 | 14/12/2023 | file |
117 | Inviting Quotations for Supply and Installation of RDSO approved GPS based Oscillation Monitoring system as per latest version | Short Quotation Notice | MMRCL/TWK/001 | 13/12/2023 | file |
118 | Design, Manufacture, Supply, Installation, Testing & Commissioning of Blow Down Plant along with Comprehensive Maintenance Service “Mumbai Metro Line-3” | Response to Bid Queries (Set-1) | MM3-CBS-DEQ-9-06D1 | 12/12/2023 | file |
119 | Design, Manufacture, Supply, Installation, Testing & Commissioning of Blow Down Plant along with Comprehensive Maintenance Service “Mumbai Metro Line-3” | Addendum No 1 | MM3-CBS-DEQ-9-06D1 | 12/12/2023 | file |
120 | Mechanized Cleaning & Housekeeping works from SEEPZ to Bandra Metro Station (09 Stations) at Line3 of MMRCL | NIT | MM3-CBS-OPS-HK-PKG02/2023 | 11/12/2023 | file |