561 | Expression of Interest (EOI) for appointment of Independent Evaluation Agency (IEA) for Evaluation of Implementation of the Rehabilitation Action Plan of Mumbai Metro Line-3 | EOI | MMRDA/MMRC | 01/01/2018 | file |
562 | EMPANELMENT OF TRAVEL AGENCY FOR BOOKING / ISSUING OF (DOMESTIC & INTERNATIONAL) AIR TICKETS, VISA, PASSPORT, HOTEL ACCOMMODATION, RAIL TICKETS (Domestic & International) and FOREIGN EXCHANGE TO CORPORATION | Tender | MMRC/Admin/E-Tender-Air Travel Agency/2017 | 21/12/2017 | file |
563 | Invitation of Bid For, “Design, Manufacture, Supply, Installation, Testing and Commissioning of E&M works comprising of Electrical Sub Stations with HT and LT works, Ventilation and Air Conditioning Systems (VAC), Fire Detection Systems, Fire Suppression (Fire Fighting) Systems, Building Management System (BMS), EOT cranes, Air-Compressors including compressed air piping works and Plumbing Pumps for the Depot Buildings including OCC and at grade Aarey Station for “Mumbai Metro Line -3” | Addendum No 5 | MM3-CBS-DEM | 16/12/2017 | file |
564 | RFP for Hiring of “Cloud based Disaster Recovery Services” from Managed Service Provider at Mumbai Metro Rail Corporation | Addendum No 4 | MMRC/IT/RFP DC-DR/71 | 04/12/2017 | file |
565 | Invitation of Bid For, “Design, Manufacture, Supply, Installation, Testing and Commissioning of E&M works comprising of Electrical Sub Stations with HT and LT works, Ventilation and Air Conditioning Systems (VAC), Fire Detection Systems, Fire Suppression (Fire Fighting) Systems, Building Management System (BMS), EOT cranes, Air-Compressors including compressed air piping works and Plumbing Pumps for the Depot Buildings including OCC and at grade Aarey Station for “Mumbai Metro Line -3” | Addendum No 4 | MM3-CBS-DEM | 20/11/2017 | file |
566 | RFP for Hiring of “Cloud based Disaster Recovery Services” from Managed Service Provider at Mumbai Metro Rail Corporation | Addendum No 3 | MMRC/IT/RFP DC-DR/71 | 17/11/2017 | file |
567 | Preparing High Definition Documentary (Audio Visual) on implementation of Mumbai Metro Line-3 covering special events and activities for the entire project development phase. | Corrigendum - 1 | MMRDA/MMRC | 10/11/2017 | file |
568 | Preparing High Definition Documentary (Audio Visual) on implementation of Mumbai Metro Line-3 covering special events and activities for the entire project development phase. | Pre-Bid Query Response | MMRDA/MMRC | 10/11/2017 | file |
569 | Request for Proposal For Selection of Managed Service Provider for Cloud based DC at Mumbai Metro Rail Corporation (MMRC) | Addendum No 2 | MMRC/IT/RFP DC-DR/71 | 03/11/2017 | file |
570 | EOI for Preparing High Definition Documentary (Audio Visual) on implementation of Mumbai Metro Line 3 covering special events and activities for the entire project development phase. | EOI | MMRDA/MMRC | 02/11/2017 | file |