601 | Procurement, Supply, Installation, Testing and Commissioning of various Power Supply works including associated Civil works, required for diversion of 220 kV and 33 kV Transmission Lines along with the Transmission towers belonging to M/s Reliance Infrastructure Ltd. in Aarey depot area for Mumbai Metro Line -3 | Addendum No 3 | MM3-CBS-REL-PYL | 26/05/2017 | file |
602 | Notice is hereby given to general public that Mumbai Metro Rail Corporation proposes to acquire properties described in following schedule for the public purpose of Metro Line 3 (Colaba-Bandra-Seepz) | Notice | MMRDA/MMRC | 19/05/2017 | file |
603 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock. | Addendum No 17 | MM3-CBS-RS | 18/05/2017 | file |
604 | Procurement, Supply, Installation, Testing and Commissioning of various Power Supply works including associated Civil works, required for diversion of 220 kV and 33 kV Transmission Lines along with the Transmission towers belonging to M/s Reliance Infrastructure Ltd. in Aarey depot area for Mumbai Metro Line -3 | Pre-Bid Query Response | MM3-CBS-REL-PYL | 16/05/2017 | file |
605 | Procurement, Supply, Installation, Testing and Commissioning of various Power Supply works including associated Civil works, required for diversion of 220 kV and 33 kV Transmission Lines along with the Transmission towers belonging to M/s Reliance Infrastructure Ltd. in Aarey depot area for Mumbai Metro Line -3 | Addendum No 2 | MM3-CBS-REL-PYL | 16/05/2017 | file |
606 | Invitation for Prequalification of bidders for Procurement of Part Design, Supply, Installation, Testing and Commissioning of Ballastless track for underground section from Aarey to Cuffe Parade, Ballasted Track in the area of at-grade Aarey station and in the Depot for the Mumbai Metro Line 3. | IFP Document | MM3-CBS-TWK | 11/05/2017 | file |
607 | Invitation for Prequalification of bidders for Procurement of Part Design, Supply, Installation, Testing and Commissioning of Ballastless track for underground section from Aarey to Cuffe Parade, Ballasted Track in the area of at-grade Aarey station and in the Depot for the Mumbai Metro Line 3. | PQ Document | MM3-CBS-TWK | 11/05/2017 | file |
608 | Transport arrangements for shifting of PAPs in andheri(east) limit from MIDC to Chakala | Notice | MMRC/Pkg-7/Transport-MIDC/NIT/2 nd call/17 | 09/05/2017 | file |
609 | Procurement, Supply, Installation, Testing and Commissioning of various Power Supply works including associated Civil works, required for diversion of 220 kV and 33 kV Transmission Lines along with the Transmission towers belonging to M/s Reliance Infrastructure Ltd. in Aarey depot area for Mumbai Metro Line -3 | Addendum No 1 | MM3-CBS-REL-PYL | 03/05/2017 | file |
610 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock | Addendum No 16 | MM3-CBS-RS | 02/05/2017 | file |