Sr. No | Package Name | Package status |
---|---|---|
1 | Rolling Stock (Package 17) | Contractor- consortium of Alstom Transport India Ltd. and Alstom Transport S.A. (Total 248 cars, 31 Train Sets of 8 cars each) 1. First prototype Train set received in temporary facilities set up at Sariput Nagar in Aarey on 5th Aug’22. 2. Initial design proving Train Trail runs flagged off by Hon’ble Chief Minister and Hon’ble Deputy Chief Minister of Maharashtra on 30th Aug’22, in about 3 Kms section on the Down Main-line between Ramp (at SEEPZ) to Marol Naka (excl.) 3. Nine (9) number of required Train sets for successful commissioning of Phase-I (Aarey to BKC) has been received at Aarey Depot. 4. Successful Train movement carried out between MIDC to Vidyanagari station covering distance of 17 kms on 8th Oct’23. 5. 10th Train Set has been received at Aarey Depot on 27th Nov’23. 6. Production of remaining Train sets are in progress at Alstom, SriCity, Andhra Pradesh |
2 | Depot-M&P (Package 9) | 1. Package (09-01)–
2. Package (09-02)– Automatic Train Wash Plant (Contractor-Cyclosystem-Inventa)– LoA awarded in Apr’23, Mfg under Progress 3. Package (09-03A)– Diesel Shunter (Contractor-MOL CY NV)– LoA awarded in Oct’23, in design stage 4. Package (09-03B)– Catenary Maintenance Vehicle– RPF Published on 06.09.23, Bid submission on 20.12.23. 5. Package (09-04)– Rail-Cum-Road Rescue Vehicle (RRV) and Re-railing Equipment (RRE) (Contractor-Premier India-ZAGRO)– RRV under Mfg and RRE commissioned on 28th Nov’23. 6. Package (09-05)– Lifting Jacks & Turn Tables (Contractor-Pfaff-Stahl) - LoA awarded in Feb’23, Mfg under progress. 7. Package (09-06A)– Material Handling Equipment– LoA awarded on 20.11.23 . 8. Package (09-06D)–
9. Package (09-06– C, B & E):- Workshop Equipment, Storage Stands & ladders and O&M Tools- RFP Preparation in Progress. |
RFP-Request for Proposal, LoA- Letter of Acceptance, Mfg- Manufacturing |