Sr. No. | Key Highlights | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | The 33.5 km long corridor will connect six business districts, 30 educational institutes, 30 recreational facilities and domestic as well as international airport terminals. | ||||||||||||
2 | There are 27 stations (26 Underground+1 at grade) in Colaba-Bandra-SEEPZ corridor | ||||||||||||
3 | 6 Central Business Districts to be connected through this project are namely:
| ||||||||||||
4 | The estimated cost of the project is around Rs. 23,136 Cr. | ||||||||||||
5 | Project Funding: The project is partially funded by JICA (Japan International Cooperation Agency) through a soft loan of Rs. 13,235 Cr. Rest of the funding is provided by GoI, GoM and others | ||||||||||||
6 | Economic Internal Rate of Return (EIRR): 17.89% | ||||||||||||
7 | Financial Internal Rate of Return (FIRR): 3.2% | ||||||||||||
8 | Project involves construction of tunnels and underground stations. This is a very challenging task and will be accomplished by deploying technologies such as tunneling by Tunnel Boring Machines(TBMs) and stations by methods of Cut and Cover or by NATM or by a combination of these two. | ||||||||||||
9 | MML-3 to be 100% Electricity Driven System, leading to zero carbon emission | ||||||||||||
10 | 25kV AC traction with regenerative braking system will be used to:
| ||||||||||||
11 | Capacity of each train is approximately 2500 passengers. | ||||||||||||
12 | The design speed of the train is 90 kmph. | ||||||||||||
13 | The commercial speed of the train will be 35 kmph including stoppages. | ||||||||||||
14 | The projected ridership of MML-3 :
| ||||||||||||
15 | Frequency
| ||||||||||||
16 | Design PHPDT for Mumbai Metro Line 3:
| ||||||||||||
17 | All Stations will be facilitated with state-of-the-art escalators and lifts. | ||||||||||||
18 | Platform screen doors will be installed to avoid any accidental fall or mishap. | ||||||||||||
19 | Automatic fare collection system and contact-less smart card will ensure ‘zero’ revenue loss. | ||||||||||||
20 | Smart Lighting and smart air-conditioning will be provided to conserve energy. | ||||||||||||
21 | Ease and Comforts of Mumbai Metro Line 3:
| ||||||||||||
22 | Rolling Stock:
|