431 | Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) andBallasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B | Addendum No 4 | MM3-CBS-TWK-03 (Package 10C) | 13/09/2019 | file |
432 | Construction of residential cum commercial high-rise building at Kalbadevi CS No. 662 and 1/662 of Bhuleshwar division for rehabilitation of Metro Line-3 Project Affected Persons of Kalbadevi and Girgaon | Notice | MMRC/Planning/NIT/K3/19/08/2nd call | 12/09/2019 | file |
433 | Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) andBallasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B | Bid Query Response | MM3-CBS-TWK-03 (Package 10C) | 11/09/2019 | file |
434 | Invitation of Quotations for Mid-Term Evaluation of Implementation of the Rehabilitation Action Plan for Mumbai Metro Line-3 | RFP | MMRC/PLN/SIA/03 | 09/09/2019 | file |
435 | Invitation of Quotations for Mid-Term Evaluation of Implementation of the Rehabilitation Action Plan for Mumbai Metro Line-3 | Notice | MMRC/PLN/SIA/03 | 09/09/2019 | file |
436 | Supply, Installation, Testing and Commissioning (SITC) of 12 nos. of Lifts/Elevator (6nos. of 612Kg / 9Person, and 6nos. of 408Kg/6 Person) including 2 years AMC work at Rehabilitation site of Mumbai Metro Rail Corporation Limited at Building No. 10 A to F Wing (2 lifts in each wing) situated in HDIL Premier Compound, Kurla, Mumbai, Pin code: - 400070. | Corrigendum - 1 | MMRC/Planning/NIT/ LiftsKurla /19/10 | 06/09/2019 | file |
437 | Design, Manufacture, Supply, Installation, Testing & Commissioning of A) Synchronized Under Floor Lifting System, B) Synchronized Mobile Lifting Jacks and C) Bogie Turn Tables | RFP | MM3-CBS-DEQ-9-05 | 05/09/2019 | file |
438 | Design, Manufacture, Supply, Installation, Testing & Commissioning of A) Synchronized Under Floor Lifting System, B) Synchronized Mobile Lifting Jacks and C) Bogie Turn Tables | Invitation for Bids | MM3-CBS-DEQ-9-05 | 05/09/2019 | file |
439 | Invitation of Tender for Hiring of Office Premises in the vicinity of MMRCL Transit Office Building, North Side of City Park, E Block, Bandra Kurla Complex, Bandra (E), Maharashtra - 400051. | Notice | MMRC/Planning/NIT//office space/19/10 | 05/09/2019 | file |
440 | Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) andBallasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B | Addendum - 3 and Bidders Queries Response | MM3-CBS-TWK-03 (Package 10C) | 04/09/2019 | file |